The legal route to sourcing fly ash from Kolaghat, Bakreswar, Sagardighi and Bandel plants — MoU with the power plant, dry ash vs pond ash, the Power Ministry's January 2026 guidelines (free delivery within 300 km) and middleman traps.
The most interesting part of the fly ash brick business ledger is this: the main raw material costs almost nothing — to a thermal power plant this ash is waste, and they spend money to dispose of it. But collecting ‘waste’ is itself a whole process — knowing the legal route, the paperwork and the new 2026 rules is essential, or you will fall into the middleman’s net.
The rules are actually on your side
Under the Environment Ministry’s (MoEFCC) fly ash utilization notification, all construction activity within 300 kilometres of a coal/lignite thermal plant must use fly ash-based products — meaning almost all of Bengal’s rice plains are this business’s market. And on the supply side, the Power Ministry’s revised guidelines of 30 January 2026 have directed plants to give ash free, with notice, to buyers within 300 km and to bear the transport burden — good news business-wise, though actual implementation varies by plant.
West Bengal’s main fly ash sources
| Plant | Location | Authority |
|---|---|---|
| Kolaghat (KTPS) | Purba Medinipur | WBPDCL |
| Bakreswar (BKTPP) | Bankura | WBPDCL |
| Sagardighi | Murshidabad | WBPDCL |
| Bandel | North 24 Parganas | WBPDCL |
| Santaldih | Bankura | WBPDCL |
| Durgapur Thermal | Paschim Bardhaman | DVC |
| Mejia | Paschim Bardhaman | DVC |
Being near a plant = lower transport cost = higher margin per brick. That is precisely why the number of new brick units in the Purba Medinipur–Panskura belt next to Kolaghat is rising fast.
Steps to getting the MoU
- Prepare your unit’s identity papers — Udyam registration, a WBPCB CTE application reference and the plant’s capacity details. Bare-handed approaches don’t work.
- Letter to the plant’s ash-management/utilization cell — on company letterhead, stating the required tonnage (daily/monthly), purpose of use and collection method.
- Sign the supply agreement/MoU — spell out in writing the tenure, tonnage, handover point, and responsibility and rate for transport.
- Gatepass and weighbridge arrangement — a gatepass for every bulker; record weights measured at the plant’s weighbridge.
- Arrange bulkers (tippers/tankers) — for dry ash, enclosed bulkers are better (less dust pollution and loss); budget hire on a per tonne-km basis.
Dry ash, pond ash and bottom ash
- Dry fly ash (ESP): ideal for the brick mix — fine and consistent. From the silo into bulkers.
- Pond ash: from the ash pond; available free or nearly free, but wet and unevenly grained, adding uncertainty to the mix. Mostly used in backfilling of large construction projects.
- Bottom ash: not used directly in bricks; some units use it as a partial substitute for sand/stone dust.
Three middleman traps
- ‘Ash lock’ commission — a promise to lock in ash supply for a monthly ‘commission’; there is no legal private commission system at plants.
- Gateless gatepass — if a truck enters the plant gate without papers, liability for smuggling is yours; with the police and the board.
- Underweight billing — no payment without your own portable weighbridge or a photo of the plant’s weighbridge slip.
Fold this into your financing
Mentioning this raw-material sourcing structure in the DPR makes bank approval easier — see the PMEGP loan guide. You will need clearance before the ash arrives — read the WBPCB CTE guide.
❓ Frequently asked questions
Is fly ash actually free?
From the source, yes — under the Power Ministry's guidelines, a power plant must give ash free to buyers within 300 kilometres, and under the revised 2026 guidelines the transport arrangement is also moving towards being the plant's responsibility. Your real cost is transport (bulker trucks) — so the plant's distance decides your raw-material cost.
Dry ash or pond ash — which is better?
For bricks, dry fly ash is best — fine, of consistent quality, and comes straight from the silo/bulker. Pond ash is dredged from the ash pond, wet and uneven in grain size — even if it is cheap or free, it causes more trouble in mixing and quality control.
Who is the MoU signed with?
With the ash-management/utilization cell of the power plant you will draw ash from. At state plants (Kolaghat, Bankura, Sagardighi, Bandel, Santaldih) the authority is WBPDCL; at central plants, DVC or NTPC. Apply by letter first, then a supply agreement and gatepass arrangement follow.
How much fly ash is needed daily?
For an 8,000-brick-a-day unit, with roughly 60% fly ash in the mix, about 15–20 tonnes a day are needed — around 450–600 tonnes a month. A medium thermal plant produces thousands of tonnes of ash a day, so transport and gatepass arrangements — not supply shortage — are the real challenge.